well.. a couple of weeks on..
I now have a steering helm, a teleflex cable, courtesy of Broombroom
![Smile :)](./images/smilies/icon_e_smile.gif)
- not fitted yet
4 brand new seats.. I hope the lack of side support in them is not going to be a problem. - not fitted yet
The suzuki outboard is still only firing on one, dut to a problem with the CDI box.. £100 replacement
![Sad :(](./images/smilies/icon_e_sad.gif)
-
The screen I sourced for £75 cut and and delivered, has gone up to £101 delivered.. exchanging the word acrylic for polycarb has caused that. not cut or fitted yet
The boat-upper has been flatted, and after applying some primer/filler, hundreds of the dreaded pin holes have shown up
![Sad :(](./images/smilies/icon_e_sad.gif)
I have gone round with some putty and filled all the groups I could see.. another flatting awaits...
The remote control issue hasn't been sorted yet, although I have my eye on a couple..
The cables for that should be on their way to me already..
The internal floor has not been touched much.. I think I will get the outside fininshed then concentrate on the inside..
The trailer needs a decent light board, some mudgaurds and marker lights as a minimum..
it's all costing a bit, and worse, taking a long time.. I have other projects on as well which doesn't help.. I was so desperate to get in the water a few times this year but it feels like it;s slipping away a bit
John